| |
Worship and Vision Enhancement
(WAVE)
Click here for Presentation
from the January 28, 2007 Congregational meeting
(password required; be sure pop-ups are allowed)
|
The WAVE project is a joint
initiative between the church council and the worship and music committee to
make some major improvements in the sound and visual aspects of our worship
services. Our desire is to enrich the worship experience for current members
and to offer worship opportunities that will welcome and engage potential new
members. In keeping with the vision of Holy Cross to “reach up, reach in, and
reach out”, this project aims to enhance our worship, touch and more effectively
teach those in attendance, and provide a vehicle to reach out to the unchurched
members of our community in ways they are most comfortable with.
There are four main areas that
will be added or enhanced by this project: sound, video, lighting, and
fellowship hall A/V. Below is a summary of what will be done in each area. For
more details, click on these drawings
1
2
3
4
5 and follow
this link for the
itemized changes. There is also
more information about
why
to do the WAVE project.
|
|

|
|

|
|
Screens
in the up position |
|
Screens in the
down position |
|
There are a large number
of enhancements to the sound system ranging from building a control booth in the
back corner and a low platform for the musicians to adjusting and replacing
speakers, to better microphones, sophisticated signal processing, air handler
noise reduction, a listening assistance system, and remote speakers for the
narthex and nursery. The goal of the sound system changes is to make the spoken
word easier to hear and understand and to balance and enrich the musical sound.
It will also make the services more inclusive by giving people with hearing
difficulties a set of headphones they can control and by giving people who have
to leave the sanctuary the opportunity to stay involved in the service by
listening from the narthex or nursery.
A video system will be
added consisting of a pair of projection screens mounted on the chancel wall, a
pair of high-brightness projectors mounted on the side walls, and control
electronics located in the control booth. When not in use, the screens will
retract into boxes mounted on the wall that will be covered with the same
wallpaper. The video system will allow us to project a variety of images to
enhance the service (primarily the second service) including song lyrics, sermon
notes, and sermon and anthem illustrations. This will help engage the large
fraction of us who are visual learners. People are becoming increasingly
accustomed to getting their information from screens, and this will allow us to
take advantage of that mode of connecting with them.
The chancel lighting
will be enhanced by the addition of highly directional and controllable lighting
on the side walls of the upper level of the sanctuary. In addition, the current
sanctuary lights will be modified to allow them to be put on dimmers that can be
controlled from the control booth as well as from either of the current switch
locations. This will allow the chancel to be lit without putting excess light
on the projection screens and will allow the use of light to direct attention
and set moods as well as providing lighting for TLC concerts and other special
events. |
|

|
|

|
| Current sound cabinets |
|
New control station |
|
In the fellowship hall we will
add a sound system using components left over from the current sanctuary sound
system. A dedicated video projector will be mounted to the ceiling to go
along with the existing screen, and a control system will be provided for
switching video sources. In addition, adjustments will be made to the air
handler to reduce the noise. These changes will enhance the adult forum
presentations as well as other presentations made in that space.
The cost of the WAVE project will
be about $240,000 – pretty evenly split between A/V equipment and construction
expenses. If approved by the congregation, it will be financed through a
combination of a fund-raising campaign and a portion of the existing building
fund. None of the cost will be included in the general operating budget.
In addition to donations, the fund-raising campaign is asking for pledges
covering up to a three-year period. A construction loan will be used to pay the
immediate expenses of the project until all of the pledges come in. So an
additional amount will have to be raised to cover the interest expense, which
could range from $10,000 to $25,000 depending on the mix of donations and
pledges.
We are very excited about this
project and hope that you will prayerfully consider supporting it. Pledges
and donations can be placed in the offering plate or given to Pastor Jim, and
the special congregational meeting to vote on the project will be January 14
after the second service. |
 |
|